Friday, May 1, 2015

Blog #4 Group 14

A. We anticipate being successful on our testing because we have taken a video of the project operating properly already and have met most of the requirements.
B. Liam and Bennett designed a ramp for the launching of the golf ball and added a light switch connected to a fan that releases the golf ball and launches it off of the ramp. Dante, Michael, and Colton designed the tubing and tracks that run along the boards and added funnels that lead to the light switch.
C. We have three simple machines, a pulley, lever, and inclined plane, and a several energy transformations. These include GPE to KE, KE to KE, KE to GPE, GPE to KE, chemical to electrical, and electrical to kinetic.

No comments:

Post a Comment